You have found the ideal plot to build your villa. Before talking about price, ask the seller one question: “Does the land have a title?” The answer changes everything: the security of your purchase, your access to credit, and the rest of your project.
Two property systems
In Morocco, two systems exist side by side.
The land title (titre foncier). This is the document issued by the National Land Registry Agency (ANCFCC) at the end of the registration procedure. It identifies the property by a number, describes its cadastral boundaries and lists the rights attached to it: owner, mortgages, easements. Once established, it is final and enforceable against everyone.
The melkia. This is a deed of ownership drawn up by two adouls, based on tradition and witness statements. The property is not recorded in the land registry: its boundaries and rights are far less certain.
What it changes in practice
- Legal security. The land title “purges” prior rights: anything not recorded on it does not exist. With a melkia, an heir or a neighbour can raise a challenge more easily.
- Credit. A bank takes a mortgage on a land title. A melkia is generally not accepted as collateral.
- Resale and inheritance. A titled property is simpler to sell and pass on, and it holds its value better.
What if the land is under melkia?
It is not necessarily a deal-breaker, but you need to know before signing. A melkia can be converted into a land title through the registration procedure with the ANCFCC: filing a registration request, boundary survey by a surveyor, public notice, a period during which third parties can lodge an objection, and finally the issuing of the title.
It often takes one to three years, depending on the region and the file. During that time, the property is “in the process of registration”: an in-between status that calls for particular care, especially if an objection is lodged.
How to check a land title
- Ask the seller for the land title number.
- Obtain a recent certificate of ownership from the land registry office, or online on the ANCFCC's Mohafadati portal if the title has been digitised. Insist that it is dated a few days ago, not several months.
- Read it line by line: does the owner's name match the seller? Is there a mortgage, a seizure, an objection, or joint ownership?
- Get support from a notary, especially if you live abroad.
The trap to avoid
A land title proves ownership, not that you can build. A perfectly titled plot may lie in an agricultural zone, or in an area where the zoning plan strictly limits what you can build. Also check the planning information note (note de renseignements urbanistiques) with the Urban Agency before buying.
In summary
Land title: security, credit, simple resale. Melkia: possible, but riskier, and to be registered. In every case: a recent certificate of ownership, a careful reading, and a planning check before signing.
At Minabayt, we design and build turnkey villas, apartment buildings and residences in Marrakech, with or without land.