Building in Morocco from abroad: the guide for Moroccans worldwide

By the Minabayt team · Updated on

You live in France, Belgium, Spain or elsewhere, and you want to build your home in Morocco? It is possible, provided you organise three things carefully: the money, the signatures and the follow-up of the works.

1. The money: opening the right account

Open a convertible dirham account (or a foreign currency account) with a Moroccan bank. Moroccans living abroad can freely finance investments in Morocco by bringing in foreign currency or by debiting a convertible dirham account.

Why it matters: if you resell, it is the record showing the funds originated in foreign currency that allows you to repatriate the money. Keep every supporting document (transfer advices, bank certificates).

A home loan in dirhams is possible to buy or build; the down payment and repayments are made in foreign currency or from a convertible dirham account.

2. The signatures: power of attorney

You cannot be there at every stage? A power of attorney lets a trusted person sign on your behalf. For deeds relating to real estate, it must be drawn up in the required legal form (authentic deed), at the consulate or before a notary, and must specify which acts, which amounts and for how long.

The building permit can be applied for by the owner or by a person holding the owner's power of attorney.

3. The land: the same checks as on site

Land title, designated use of the land, planning information note, zoning plan: distance changes nothing. Have a notary check everything and follow our land checklist.

4. Following the works remotely

Insist from the outset on: a schedule, an item-by-item budget, a single person in charge, photos and videos every week, and video calls to approve key stages (plans, materials, finishes). Plan a visit during your stays in Morocco.

5. Mistakes to avoid

  1. Sending money in cash or without a bank record.
  2. Signing a power of attorney that is too broad or has no time limit.
  3. Entrusting the works to several contractors with no single person in charge.
  4. Starting without a building permit.