Earth is Morocco's historic building material: kasbahs, ksour, the ramparts of Marrakech. Today it is making a comeback in contemporary architecture. Here are the techniques, the regulatory framework and what you need to know before you start.
The main techniques
- Rammed earth (pisé): earth compacted in layers inside formwork. Thick walls with a characteristic striated look.
- Adobe: raw earth bricks, moulded and dried in the sun. Allows arches, vaults and rounded shapes.
- Cob (bauge): earth mixed with fibres and shaped by hand.
- Compressed earth blocks (CEB, BTC in French): pressed, regular blocks, suited to clean façades and larger buildings.
- Earth renders and finishes: lime renders, tadelakt, earth floors.
The regulatory framework in Morocco
Morocco has seismic regulations specific to earth buildings, the RPCTerre 2011, approved by Decree No. 2-12-666 (2013) and supplemented by a decree adopted in 2024. They apply to earth buildings for which using an architect or an engineer is mandatory. A separate booklet (RPACTerre) sets out good-practice rules for self-builders.
In plain terms: a modern earth building is designed with an architect and an engineering firm that apply these regulations.
Why build with earth
- A local, readily available material with low manufacturing energy.
- Thick walls with high thermal mass, suited to Marrakech's wide temperature swings.
- A warm, unique look, in keeping with the city's architecture.
What to check before choosing earth
- What the zoning plan allows on the plot (appearance, height).
- A design compliant with RPCTerre 2011, with suitable foundations and plinths.
- Renders and roof overhangs that protect the walls from water.
- Craftspeople and a contractor who master the chosen technique.
- Mixed techniques: a concrete frame with CEB walls, or earth walls on the façade, which are often simpler to get approved.
The earth-built projects shown on this site are concepts; every real project is studied with an architect and an engineering firm.