What we do in Agdal
Bespoke villas and residences close to the city, designed to make the most of plots that are often smaller than on the outskirts.
We handle the land study, design, building permit, construction and handover of the keys.
The area
Agdal is a residential district south of the medina ramparts, along the extended boulevard Mohammed VI, which runs beside the Agdal walls towards the Ourika road. It takes its name from the Agdal Gardens, a historic orchard created in the 12th century under the Almohad ruler Abd el-Moumen, south of the Kasbah and the royal palace, and listed as a UNESCO World Heritage Site in 1985 together with the medina and the Menara gardens. It is an area of villas, residences and hotels.
Source: UNESCO — Medina of Marrakesh
What to check before buying land in Agdal
- Height and setbacks. Plots are usually smaller than on the outskirts: the height and setbacks set by the zoning plan shape the design. Zoning plan (glossary)
- Planning information note. Ask the Urban Agency for it: it states what is permitted on the plot. Planning information note (glossary)
- Land title. Insist on titled land and a recent certificate of ownership. Guide “Land title or melkia”
- Designated use. Check the permitted use before buying. VNA (glossary) · Land checklist