Aller au contenu

Areas

Building your villa in Targa, Marrakech

Turnkey design and build, with or without land

What we do in Targa

Bespoke villas and, where the zoning plan allows, small buildings, on subdivision plots.

We handle the land study, design, building permit, construction and handover of the keys.

The area

Targa is a residential district in the west of Marrakech, close to Guéliz and in line with avenue Mohammed V. It is mainly made up of villas in a low-density setting, minutes from the city centre and Menara airport. Plots there are generally smaller and located in subdivisions.

What to check before buying land in Targa

Frequently asked questions

A plot in Targa? Let's talk

General information: the applicable rules depend on each plot. Always check the planning information note and the zoning plan.

← Where we build in Marrakech