Aller au contenu

Areas

Building your villa in the Palmeraie, Marrakech

Turnkey design and build, with or without land

What we do in the Palmeraie

Bespoke low-rise villas, integrated into the landscape, that keep the existing palms in the plan.

We handle the land study, design, building permit, construction and handover of the keys.

The area

The Palmeraie is the historic palm grove in the north of Marrakech, now a residential area of large villas and large plots. Its date palms are protected by law 01-06 (dahir of 17 April 2007) on the sustainable development of palm groves: uprooting a palm without authorisation is fined (10,000 DH per palm, as reported by Hespress). Since 2007, the Fondation Mohammed VI pour la Protection de l'Environnement has run a programme to save and replant the Palmeraie. Some sectors are protected natural sites where building is forbidden or very limited.

What to check before buying land in the Palmeraie

Frequently asked questions

A plot in the Palmeraie? Let's talk

General information: the applicable rules depend on each plot. Always check the planning information note and the zoning plan.

← Where we build in Marrakech