Aller au contenu

Areas

Building your villa in Tamansourt, Marrakech

Turnkey design and build, with or without land

What we do in Tamansourt

Villas on lots and small apartment buildings, according to each subdivision's specifications.

We handle the land study, design, building permit, construction and handover of the keys.

The area

Tamansourt is a new town developed by the public developer Al Omrane on the Safi road, north-west of Marrakech, in the commune of Harbil. It was created to ease the growth of Marrakech; its planning was revised to house around 200,000 inhabitants (Médias24, 2022). It is mostly made up of subdivisions and apartment buildings.

Source: Médias24 (2022)

What to check before buying land in Tamansourt

Frequently asked questions

A plot in Tamansourt? Let's talk

General information: the applicable rules depend on each plot. Always check the planning information note and the zoning plan.

← Where we build in Marrakech